The original paper is in English. Non-English content has been machine-translated and may contain typographical errors or mistranslations. ex. Some numerals are expressed as "XNUMX".
Copyrights notice
The original paper is in English. Non-English content has been machine-translated and may contain typographical errors or mistranslations. Copyrights notice
Dalam kertas kerja ini, pendekatan baharu dicadangkan untuk menyelesaikan masalah penjadualan sebenar dalam proses pemasangan acuan logam. Proses ini adalah jenis kedai kerja, dan masalahnya adalah berskala besar dan mempunyai kekangan yang rumit. Dalam masalah ini hubungan keutamaan wujud bukan sahaja dalam kalangan operasi tetapi juga antara pekerjaan. Sistem ini mempunyai beberapa jenis mesin fungsi tunggal dan jenis mesin pelbagai fungsi. Tambahan pula, bilangan mesin kepunyaan setiap jenis bukan tunggal tetapi jamak. Oleh itu pemilihan mesin adalah perlu untuk melaksanakan setiap operasi. Kaedah penjadualan terpencar autonomi digunakan untuk masalah ini. Dalam kaedah ini, beberapa pembuat keputusan yang dipanggil modul bekerjasama antara satu sama lain untuk mencapai matlamat keseluruhan sistem. Mereka menentukan pelan penjadualan berdasarkan kerjasama mereka dan kepuasan tahap fungsi objektif mereka sendiri. Khususnya, kebolehpraktisan kaedah ini dipertimbangkan melalui keputusan berangka.
The copyright of the original papers published on this site belongs to IEICE. Unauthorized use of the original or translated papers is prohibited. See IEICE Provisions on Copyright for details.
Salinan
Hitoshi IIMA, Norihisa ICHIMI, Nobuo SANNOMIYA, Yasunori KOBAYASHI, "Practicability of Autonomous Decentralized Scheduling Method for a Metal Mold Assembly Process" in IEICE TRANSACTIONS on Communications,
vol. E83-B, no. 5, pp. 1060-1066, May 2000, doi: .
Abstract: In this paper, a new approach is proposed for solving a real scheduling problem in a metal mold assembly process. This process is of a job-shop type, and the problem is large-scale and has complicated constraints. In this problem precedence relations exist not only among operations but also among jobs. The system has several types of single function machines and a type of multi-function machine. Furthermore, the number of machines belonging to each type is not single but plural. Therefore the selection of machine is necessary for executing each operation. An autonomous decentralized scheduling method is applied to this problem. In this method, a number of decision makers called modules cooperate with one another in order to attain the goal of the overall system. They determine the scheduling plan on the basis of their cooperation and the satisfaction of their own objective function levels. Particularly, the practicability of this method is considered through numerical results.
URL: https://global.ieice.org/en_transactions/communications/10.1587/e83-b_5_1060/_p
Salinan
@ARTICLE{e83-b_5_1060,
author={Hitoshi IIMA, Norihisa ICHIMI, Nobuo SANNOMIYA, Yasunori KOBAYASHI, },
journal={IEICE TRANSACTIONS on Communications},
title={Practicability of Autonomous Decentralized Scheduling Method for a Metal Mold Assembly Process},
year={2000},
volume={E83-B},
number={5},
pages={1060-1066},
abstract={In this paper, a new approach is proposed for solving a real scheduling problem in a metal mold assembly process. This process is of a job-shop type, and the problem is large-scale and has complicated constraints. In this problem precedence relations exist not only among operations but also among jobs. The system has several types of single function machines and a type of multi-function machine. Furthermore, the number of machines belonging to each type is not single but plural. Therefore the selection of machine is necessary for executing each operation. An autonomous decentralized scheduling method is applied to this problem. In this method, a number of decision makers called modules cooperate with one another in order to attain the goal of the overall system. They determine the scheduling plan on the basis of their cooperation and the satisfaction of their own objective function levels. Particularly, the practicability of this method is considered through numerical results.},
keywords={},
doi={},
ISSN={},
month={May},}
Salinan
TY - JOUR
TI - Practicability of Autonomous Decentralized Scheduling Method for a Metal Mold Assembly Process
T2 - IEICE TRANSACTIONS on Communications
SP - 1060
EP - 1066
AU - Hitoshi IIMA
AU - Norihisa ICHIMI
AU - Nobuo SANNOMIYA
AU - Yasunori KOBAYASHI
PY - 2000
DO -
JO - IEICE TRANSACTIONS on Communications
SN -
VL - E83-B
IS - 5
JA - IEICE TRANSACTIONS on Communications
Y1 - May 2000
AB - In this paper, a new approach is proposed for solving a real scheduling problem in a metal mold assembly process. This process is of a job-shop type, and the problem is large-scale and has complicated constraints. In this problem precedence relations exist not only among operations but also among jobs. The system has several types of single function machines and a type of multi-function machine. Furthermore, the number of machines belonging to each type is not single but plural. Therefore the selection of machine is necessary for executing each operation. An autonomous decentralized scheduling method is applied to this problem. In this method, a number of decision makers called modules cooperate with one another in order to attain the goal of the overall system. They determine the scheduling plan on the basis of their cooperation and the satisfaction of their own objective function levels. Particularly, the practicability of this method is considered through numerical results.
ER -