The original paper is in English. Non-English content has been machine-translated and may contain typographical errors or mistranslations. ex. Some numerals are expressed as "XNUMX".
Copyrights notice
The original paper is in English. Non-English content has been machine-translated and may contain typographical errors or mistranslations. Copyrights notice
Baru-baru ini, sistem lif berbilang kereta (MCE) telah menarik perhatian sebagai cara yang berkesan untuk meningkatkan keupayaan pengangkutan di bangunan bertingkat tinggi. MCE mempunyai dua atau lebih kereta dalam satu aci. Dalam kertas ini, kami mencadangkan algoritma untuk pengawal kumpulan sistem MCE, dan menunjukkan keberkesanan algoritma kami melalui simulasi komputer.
The copyright of the original papers published on this site belongs to IEICE. Unauthorized use of the original or translated papers is prohibited. See IEICE Provisions on Copyright for details.
Salinan
Yuki KURODA, Mitsuru NAKATA, "An Algorithm to Minimize Average Service Completion Time for the Group Controller of Multi-Car Elevator Systems" in IEICE TRANSACTIONS on Fundamentals,
vol. E91-A, no. 11, pp. 3215-3218, November 2008, doi: 10.1093/ietfec/e91-a.11.3215.
Abstract: Recently, multi-car elevator (MCE) system has captured attention as an effective mean for the improvement of transportation capability in a high-rise building. The MCE has two or more cars in one shaft. In this paper, we propose an algorithm for group controllers of MCE system, and show the effectiveness of our algorithm through computer simulation.
URL: https://global.ieice.org/en_transactions/fundamentals/10.1093/ietfec/e91-a.11.3215/_p
Salinan
@ARTICLE{e91-a_11_3215,
author={Yuki KURODA, Mitsuru NAKATA, },
journal={IEICE TRANSACTIONS on Fundamentals},
title={An Algorithm to Minimize Average Service Completion Time for the Group Controller of Multi-Car Elevator Systems},
year={2008},
volume={E91-A},
number={11},
pages={3215-3218},
abstract={Recently, multi-car elevator (MCE) system has captured attention as an effective mean for the improvement of transportation capability in a high-rise building. The MCE has two or more cars in one shaft. In this paper, we propose an algorithm for group controllers of MCE system, and show the effectiveness of our algorithm through computer simulation.},
keywords={},
doi={10.1093/ietfec/e91-a.11.3215},
ISSN={1745-1337},
month={November},}
Salinan
TY - JOUR
TI - An Algorithm to Minimize Average Service Completion Time for the Group Controller of Multi-Car Elevator Systems
T2 - IEICE TRANSACTIONS on Fundamentals
SP - 3215
EP - 3218
AU - Yuki KURODA
AU - Mitsuru NAKATA
PY - 2008
DO - 10.1093/ietfec/e91-a.11.3215
JO - IEICE TRANSACTIONS on Fundamentals
SN - 1745-1337
VL - E91-A
IS - 11
JA - IEICE TRANSACTIONS on Fundamentals
Y1 - November 2008
AB - Recently, multi-car elevator (MCE) system has captured attention as an effective mean for the improvement of transportation capability in a high-rise building. The MCE has two or more cars in one shaft. In this paper, we propose an algorithm for group controllers of MCE system, and show the effectiveness of our algorithm through computer simulation.
ER -